General
Project
Description - The description of the project
as given from sponsor
Code
of Conduct - This is a document drafted
by the group. It indicats the measures that will be taken
throughout the project
Team
Building Activity Report -A document of
the team building activity the group underwent to help begin
to open the lines of communication between members
Fastener
Presentation - As part of the team building
exercise, the task of designing a new type of fastener that
didn't use any sort of screw was used to help with the ability
of sharing and brainstorming ideas amongst members. For a
quick glance at the fastener design, click here
Deliverables
Fall
2009
Product
Specifications - A document that entails
the guidelines and limitations that the product should adhere
Final
Fall Report - This is the final report
for the fall 2009 semester
Spring
Proposal - This document tells of the
plan of action for Spring 2010 semester
Spring
2010
Manufacturing
Document - This document indicates
proper manufacturing techniques
Installation
Document - This document consists
of the proper installation techniques
Emergency
Panel Repair - If one or more of the
panels are damaged refer to this document for the repairing
solution
Detailed
Cost Analysis- This document provides
the total cost in detail
Final
Report
- A comprehensive report is provided concluding Spring
2010
Final
Presentation
- Final Spring 2010 presentation
|